Completed Infrastructure

COMPLETED JOBS > INFRASTRUCTURE

View Photo Gallery

 


Kihei Sewer Treatment Facility, Maui
Built by Goodfellow Bros., Inc., in the early 1980s, this treatment facility has supported the increasing needs of Maui’s fastest-growing community. Kihei receives minimal annual rainfall, so all wastewater is treated and reused throughout the community’s parks and recreation facilities.

 

 

 

Makena Sewer Treatment Facility, Maui
Goodfellow Bros., Inc., built this treatment facility for Makena Resort, bringing this private development into EPA compliance. The facility also feeds the irrigation needs of two golf courses designed by Robert Trent Jones, Jr.—and constructed by Goodfellow Bros., Inc.

 

 

 

Kalamaula Residence, Molokai

Goodfellow Bros., Inc., constructed water and drainage improvements and roadways for this new subdivision of 124 one-acre lots.

 

 

 

 

138th Avenue Force and Gravity Sewer Mains, Soos Creek, Washington
Weaving through wetlands and boring under several creeks with depths of 25 feet or more, this project offered a number of interesting challenges. Goodfellow Bros., Inc., installed more than two miles of 10 and 12-inch force and gravity sewer mains, much of which required well-point dewatering.

 

 

 

Peshastin Wastewater Treatment Facility, Washington
This facility comprises more than five miles of mechanical and offsite infrastructure. Despite an accelerated completion schedule, the project was a success, thanks to excellent teamwork by the owner, the engineer, and Goodfellow Bros., Inc.